Phase 0B · West Salem Works · Living Document

Site Activation

Activate now. Prove demand. Fund the future. The interim strategies that turn the district on before the cranes arrive.

Now City Market · 400 Patterson Live-Work Campus · Arts District · Scandi Block
Overview

The operating prototype for the full district

Before vertical construction begins, the district goes to work. Interim activation creates immediate operating identity, tenant demand, community support, and revenue — while the Mark May JV and long-term ground-up phases proceed. Each activation layer is conservative, fast, and reversible: control strategic buildings, activate them economically, prove demand, then exercise options or move into permanent development.

This page collects the activation concepts in one place as part of the living plan. Strategy context lives in the Business Plan (Phase 0B — Interim Activation & Revenue Strategy); investment context in the Investment Summary.
01 · Site Activation Strategy

Now City Market: activate the Wallace Road frontage now

A daily civic marketplace on the district's most visible edge — 12,100 to 41,200 vehicles per day, in a city of 180,000 (440,000 metro). Low capital, flexible structures, immediate cultural momentum: a $1.3M–$1.4M prototype built from timber, containers, and mobile elements that keeps Phase 1B land "alive" while proving the district to the region.

From the Now City Market — Site Activation Strategy (March 2026). Slides presented as designed.

Now City Market site activation strategy cover
Neighborhoods designed for life
Activate the Wallace Road frontage now
The paradigm shift — traditional development versus activation-first
Why Wallace Road wins — traffic and population
The anchor: a daily civic marketplace
The neighborhood ecosystem
The financial prototype — total estimated capital $1.3M to $1.4M
Underwriting the prototype
The real value multiplier — approximately $4.2M increase in real estate value at a 6% cap rate
The transition timeline
The beating heart beneath — site plan
Enable Phase 1B to become the living prototype

Precedents

Torvehallerne, Copenhagen precedent
Torvehallerne — Copenhagen, Denmark
Reffen and Broens, Copenhagen precedent
Reffen & Broens — Copenhagen, Denmark
Boxpark, London precedent
Boxpark — London, United Kingdom
02 · Initial Plan · 400 Patterson

The Bow-Truss Live-Work Campus

A lease-to-own structure for the 400 Patterson bow-truss warehouse campus creates immediate income and proves district demand before full redevelopment — while preserving flexibility if the buildings are later replaced by the permanent sports & entertainment phase.

Buildings 1 & 2 · Live-Work Lofts

  • Two of the three 40,000 SF buildings converted into 50–60 large, raw, high-ceiling live-work lofts
  • Roughly 1,500–2,000 SF each
  • Built fast and economically with modular/demountable interiors
  • Target hard-cost range starting around $50/SF

Building 3 · Sports & Wellness Center

  • Pickleball / padel courts
  • Fitness and indoor recreation
  • Youth programming
  • Events
  • Pilots the permanent 100,000+ SF sports & recreation facility planned for Phase 3

The Economics

  • Interim operating revenue from day one
  • Activates the district and builds community
  • Supports the lease-option economics
  • Helps finance eventual acquisition
  • Preserves long-term flexibility
Aerial of the 400 Patterson bow-truss campus
The campus today — three 40,000 SF bow-truss buildings
Bow truss interior with timber trusses
Clear spans, high ceilings, heavy timber — the raw material
High-ceiling live-work loft reference
Raw loft interior reference
Gallery-style live-work loft reference

Live-work loft concept references

Bow truss interior volume
40,000 SF volumes ready for modular fit-out
Bow truss interior with mezzanine
Existing mezzanine condition — a template for loft sections
03 · Concept · 809 Edgewater + 300 Patterson

The Arts District

We imagine 809 Edgewater and parts of 300 Patterson as an Arts District — galleries, studios, markets, and evening programming that bring people to the riverfront early, build cultural identity, and seed demand for the district's later phases, while protecting 809 Edgewater for its highest and best long-term use.

809 Edgewater Arts District interim use concept — evening riverfront market and galleries
809 Edgewater — Arts District interim use concept
300 Patterson existing warehouse campus aerial
300 Patterson — existing campus, future studios & galleries
300 Patterson existing building frontage
Existing conditions along Patterson St NW
04 · Phase 1A Investor Preview

The Scandi Block: where activation becomes permanence

The activation layers feed directly into the district's first permanent build — a 2.3-acre Scandinavian courtyard block with Japanese garden philosophy: 200 attainable, healthy, beautiful homes around a quiet interior garden with walkable retail edges.

From the Scandi Block Investor Preview (March 2026). Slides presented as designed; current financials in the Investment Summary.

Scandi Block investor preview cover — neighborhoods designed for life
A better way to live — courtyard interiors
Copenhagen courtyard blocks and Japanese spatial calm — 200 homes
Home as sanctuary
An economy of care — daily life amenities
Regenerative daily life
The Salem thesis
Unlocking the corridor
The physical program
Phase 1A baseline financials
Co-GP financial overview
Capital requirement
The strategic bottom line
Building places people truly care about
Scandi Block closing slide
Join Us

Be part of Salem's
transformation.

Visit nowcity.co to learn more about Now City.